Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/16 00:00 0.00 391.30 371.90 13.80 11/16 01:00 0.00 391.43 372.01 13.30 11/16 02:00 0.00 391.54 372.12 13.40 11/16 03:00 0.00 391.41 371.93 13.40 11/16 04:00 0.00 391.42 371.86 13.60 11/16 05:00 0.00 391.51 371.69 13.20 11/16 06:00 0.00 391.49 371.73 13.20 11/16 07:00 0.00 391.41 371.77 13.20 11/16 08:00 0.00 391.44 371.63 14.00 11/16 09:00 0.00 391.50 371.52 13.20 11/16 10:00 0.00 391.59 371.72 13.40 11/16 11:00 0.00 391.65 371.95 13.20 11/16 12:00 0.00 391.62 371.87 13.50 11/16 13:00 0.00 391.66 371.68 13.30 11/16 14:00 0.00 391.64 371.59 13.80 11/16 15:00 0.00 391.58 371.63 13.30 11/16 16:00 0.00 391.59 371.79 13.20 11/16 17:00 0.00 391.59 371.80 13.20 11/16 18:00 0.00 391.60 371.76 13.30 11/16 19:00 0.00 391.56 371.79 13.90 11/16 20:00 0.00 391.56 371.80 13.50 11/16 21:00 0.00 391.56 371.82 13.30 11/16 22:00 0.00 391.61 371.84 13.30 11/16 23:00 0.00 391.63 371.81 13.50