Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/17 00:00 0.00 391.62 371.62 13.30 11/17 01:00 0.00 391.63 371.83 13.50 11/17 02:00 0.00 391.53 371.88 13.20 11/17 03:00 0.00 391.56 371.78 13.20 11/17 04:00 0.00 391.57 371.43 13.30 11/17 05:00 0.00 391.07 371.42 13.10 11/17 06:00 0.00 391.46 370.54 13.80 11/17 07:00 0.00 391.56 371.58 13.50 11/17 08:00 0.00 391.50 371.36 13.80 11/17 09:00 0.00 391.50 371.18 13.70 11/17 10:00 0.00 391.79 371.19 13.90 11/17 11:00 0.00 391.86 371.45 13.30 11/17 12:00 0.00 391.83 371.46 13.10 11/17 13:00 0.00 391.73 371.29 13.50 11/17 14:00 0.00 391.85 371.21 13.20 11/17 15:00 0.00 391.74 371.25 13.80 11/17 16:00 0.00 391.69 371.38 13.50 11/17 17:00 0.00 391.77 371.28 13.40 11/17 18:00 0.00 391.65 371.63 13.90 11/17 19:00 0.00 391.52 372.03 13.90 11/17 20:00 0.00 391.65 372.30 13.30 11/17 21:00 0.00 391.60 372.33 14.00 11/17 22:00 0.00 391.52 372.48 14.00 11/17 23:00 0.00 391.47 372.55 13.60