Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/15 00:00 0.00 391.71 372.88 13.30 11/15 01:00 0.00 391.65 372.44 13.80 11/15 02:00 0.00 391.59 372.28 13.20 11/15 03:00 0.00 391.53 372.63 13.40 11/15 04:00 0.00 391.72 372.03 13.20 11/15 05:00 0.00 391.55 371.26 13.60 11/15 06:00 0.00 391.28 366.30 13.20 11/15 07:00 0.00 391.40 371.20 13.90 11/15 08:00 0.00 391.51 371.66 13.30 11/15 09:00 0.00 391.58 372.08 13.40 11/15 10:00 0.00 391.68 372.05 13.30 11/15 11:00 0.00 391.67 371.96 13.30 11/15 12:00 0.00 391.68 371.91 ---- 11/15 13:00 0.00 391.64 371.97 9.50 11/15 14:00 0.00 391.47 372.12 13.70 11/15 15:00 0.00 391.61 371.53 13.20 11/15 16:00 0.00 391.60 371.54 13.30 11/15 17:00 0.00 391.56 372.15 13.20 11/15 18:00 0.00 391.67 372.29 13.20 11/15 19:00 0.00 391.48 372.71 13.30 11/15 20:00 0.00 391.53 372.68 13.20 11/15 21:00 0.00 391.52 372.65 13.30 11/15 22:00 0.00 391.78 372.16 13.30 11/15 23:00 0.00 391.50 372.15 13.80