Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/23 00:00 0.00 391.50 371.10 13.10 09/23 01:00 0.00 391.48 371.38 13.30 09/23 02:00 0.00 391.60 371.48 13.50 09/23 03:00 0.00 391.63 371.43 13.00 09/23 04:00 0.00 391.49 371.29 13.40 09/23 05:00 0.00 391.55 371.26 13.00 09/23 06:00 0.00 391.61 371.44 13.00 09/23 07:00 0.00 391.56 371.49 13.30 09/23 08:00 0.00 391.51 371.38 13.20 09/23 09:00 0.00 391.57 371.05 12.90 09/23 10:00 0.00 391.58 370.94 13.00 09/23 11:00 0.00 391.53 371.06 13.80 09/23 12:00 0.00 391.56 371.03 13.10 09/23 13:00 0.00 391.57 370.89 13.10 09/23 14:00 0.00 391.55 370.71 13.40 09/23 15:00 0.00 391.37 370.77 13.10 09/23 16:00 0.00 391.30 371.00 13.50 09/23 17:00 0.00 391.40 371.73 13.10 09/23 18:00 0.00 391.64 371.82 13.00 09/23 19:00 0.00 391.62 371.76 13.10 09/23 20:00 0.00 391.63 371.75 13.40 09/23 21:00 0.00 391.89 371.36 13.30 09/23 22:00 0.00 391.77 370.96 13.60 09/23 23:00 0.00 391.54 370.93 13.00