Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/24 00:00 0.00 391.56 371.41 13.20 09/24 01:00 0.00 391.72 371.52 13.90 09/24 02:00 0.00 391.65 366.47 13.60 09/24 03:00 0.00 391.55 371.11 13.20 09/24 04:00 0.00 391.62 371.15 13.30 09/24 05:00 0.00 391.67 371.37 13.70 09/24 06:00 0.00 391.60 371.43 13.20 09/24 07:00 0.00 391.56 371.31 13.20 09/24 08:00 0.00 391.64 371.18 13.90 09/24 09:00 0.00 391.62 371.23 13.00 09/24 10:00 0.00 391.58 371.35 13.50 09/24 11:00 0.00 391.58 371.39 13.80 09/24 12:00 0.00 391.64 371.29 12.90 09/24 13:00 0.00 391.60 371.20 13.30 09/24 14:00 0.00 391.60 0.00 13.00 09/24 15:00 0.00 391.62 371.33 ---- 09/24 16:00 0.00 391.48 371.69 13.50 09/24 17:00 0.00 391.37 371.43 13.30 09/24 18:00 0.00 391.73 371.78 13.60 09/24 19:00 0.00 391.81 371.93 13.00 09/24 20:00 0.00 391.80 372.00 13.80 09/24 21:00 0.00 391.85 372.20 13.70 09/24 22:00 0.00 391.78 372.07 12.80 09/24 23:00 0.00 392.04 371.45 12.80