Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/22 00:00 0.00 391.61 371.36 13.00 09/22 01:00 0.00 391.62 371.13 13.80 09/22 02:00 0.00 391.62 371.05 13.30 09/22 03:00 0.00 391.45 371.15 13.00 09/22 04:00 0.00 391.49 371.29 12.90 09/22 05:00 0.00 391.51 371.31 13.00 09/22 06:00 0.00 391.49 371.19 13.00 09/22 07:00 0.00 391.45 371.14 13.50 09/22 08:00 0.00 391.50 371.09 13.20 09/22 09:00 0.00 391.49 370.91 13.60 09/22 10:00 0.00 391.45 370.85 12.90 09/22 11:00 0.00 391.47 370.82 13.70 09/22 12:00 0.00 391.49 370.78 13.70 09/22 13:00 0.00 391.46 370.77 13.00 09/22 14:00 0.00 391.46 370.52 13.70 09/22 15:00 0.00 391.46 370.44 12.90 09/22 16:00 0.00 391.34 370.69 13.70 09/22 17:00 0.00 391.41 371.00 12.90 09/22 18:00 0.00 391.37 371.63 13.70 09/22 19:00 0.00 391.54 371.57 13.70 09/22 20:00 0.00 391.55 371.63 13.30 09/22 21:00 0.00 391.71 371.40 13.20 09/22 22:00 0.00 391.68 371.06 13.80 09/22 23:00 0.00 391.78 370.97 13.00