Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/14 00:00 0.00 391.45 373.12 13.70 08/14 01:00 0.00 391.43 373.17 13.00 08/14 02:00 0.00 391.44 372.79 12.90 08/14 03:00 0.00 391.39 373.23 13.00 08/14 04:00 0.00 391.36 373.17 13.50 08/14 05:00 0.00 391.38 372.75 13.60 08/14 06:00 0.00 391.35 373.06 13.70 08/14 07:00 0.00 391.35 373.07 13.10 08/14 08:00 0.00 391.30 373.15 13.80 08/14 09:00 0.00 391.28 373.10 13.00 08/14 10:00 0.00 391.30 373.02 13.30 08/14 11:00 0.00 391.31 372.95 13.30 08/14 12:00 0.00 391.33 372.93 13.10 08/14 13:00 0.00 391.36 372.76 13.20 08/14 14:00 0.00 391.43 372.69 12.90 08/14 15:00 0.00 391.43 372.56 13.10 08/14 16:00 0.00 391.49 372.48 13.00 08/14 17:00 0.00 391.46 372.24 13.10 08/14 18:00 0.00 391.47 372.44 13.00 08/14 19:00 0.00 391.50 372.28 13.80 08/14 20:00 0.00 391.51 372.26 13.40 08/14 21:00 0.00 391.52 372.30 13.10 08/14 22:00 0.00 391.52 372.31 13.50 08/14 23:00 0.00 391.55 372.30 13.60