Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/15 00:00 0.00 391.49 372.35 13.40 08/15 01:00 0.00 391.51 372.16 13.50 08/15 02:00 0.00 391.52 372.26 13.50 08/15 03:00 0.00 391.44 367.04 13.10 08/15 04:00 110.47 391.55 371.76 13.60 08/15 05:00 0.00 391.58 371.69 13.70 08/15 06:00 0.00 391.54 371.62 13.50 08/15 07:00 0.00 391.60 371.72 13.50 08/15 08:00 0.00 391.61 371.80 13.30 08/15 09:00 0.00 391.67 371.74 13.10 08/15 10:00 0.00 391.70 371.74 13.80 08/15 11:00 0.00 391.73 371.81 13.80 08/15 12:00 0.00 391.77 371.82 13.50 08/15 13:00 0.00 391.73 371.94 13.70 08/15 14:00 0.00 391.75 372.14 13.10 08/15 15:00 0.00 391.76 372.24 13.40 08/15 16:00 0.00 391.79 372.26 13.30 08/15 17:00 0.00 391.77 372.32 13.20 08/15 18:00 0.00 391.77 372.40 13.70 08/15 19:00 0.00 391.76 372.48 13.20 08/15 20:00 0.00 391.77 372.49 13.70 08/15 21:00 0.00 391.77 372.44 13.40 08/15 22:00 0.00 391.76 372.42 13.10 08/15 23:00 0.00 391.76 372.42 13.60