Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/13 00:00 0.00 391.48 373.96 13.10 08/13 01:00 0.00 391.48 374.01 13.10 08/13 02:00 0.00 391.46 374.06 13.20 08/13 03:00 0.00 391.47 374.07 13.70 08/13 04:00 0.00 391.48 374.10 13.80 08/13 05:00 0.00 391.47 374.14 13.10 08/13 06:00 0.00 391.49 374.14 13.40 08/13 07:00 0.00 391.49 374.13 13.70 08/13 08:00 0.00 391.50 374.16 13.20 08/13 09:00 0.00 391.50 374.16 13.30 08/13 10:00 0.00 391.51 374.18 13.20 08/13 11:00 0.00 391.53 374.15 13.60 08/13 12:00 0.00 391.54 374.18 13.10 08/13 13:00 0.00 391.45 374.15 13.30 08/13 14:00 0.00 391.44 373.80 13.80 08/13 15:00 0.00 391.45 373.62 13.40 08/13 16:00 0.00 391.44 373.52 13.30 08/13 17:00 0.00 391.43 373.43 13.30 08/13 18:00 0.00 391.45 373.38 13.20 08/13 19:00 0.00 391.51 373.34 13.10 08/13 20:00 0.01 391.43 373.36 13.90 08/13 21:00 0.00 391.46 373.26 13.80 08/13 22:00 0.00 391.43 373.23 13.20 08/13 23:00 0.00 391.45 373.17 13.00