Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/05 00:00 0.00 389.41 385.56 13.40 06/05 01:00 0.00 389.45 385.45 12.90 06/05 02:00 0.00 389.46 385.26 13.20 06/05 03:00 0.00 389.73 384.74 13.20 06/05 04:00 0.00 389.68 384.62 13.80 06/05 05:00 0.00 389.61 384.49 13.20 06/05 06:00 0.00 389.74 384.09 13.20 06/05 07:00 0.00 389.75 383.94 13.30 06/05 08:00 0.00 389.72 383.83 13.80 06/05 09:00 0.00 389.70 383.78 13.20 06/05 10:00 0.00 389.79 383.64 13.30 06/05 11:00 0.00 389.88 383.26 13.20 06/05 12:00 0.00 389.88 383.14 13.50 06/05 13:00 0.00 390.00 382.81 13.20 06/05 14:00 0.00 389.90 382.75 13.30 06/05 15:00 0.00 389.98 382.33 13.50 06/05 16:00 0.00 390.07 382.00 13.80 06/05 17:00 0.00 390.04 381.91 13.70 06/05 18:00 0.01 390.08 381.74 13.70 06/05 19:00 0.00 390.05 381.64 13.20 06/05 20:00 0.00 389.99 381.57 13.30 06/05 21:00 0.00 390.07 381.33 13.30 06/05 22:00 0.00 390.11 381.15 13.20 06/05 23:00 0.00 390.10 381.06 13.30