Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/04 00:00 0.00 389.23 386.34 13.10 06/04 01:00 0.00 389.33 386.36 13.70 06/04 02:00 0.00 389.32 386.32 13.10 06/04 03:00 0.00 389.33 386.34 13.40 06/04 04:00 0.00 389.39 386.34 13.30 06/04 05:00 0.00 389.38 386.35 13.80 06/04 06:00 0.00 389.33 386.38 13.20 06/04 07:00 0.00 389.35 386.36 13.20 06/04 08:00 0.00 389.31 386.52 13.30 06/04 09:00 0.00 389.38 386.38 13.60 06/04 10:00 0.00 389.39 386.38 13.20 06/04 11:00 0.00 389.41 386.41 13.10 06/04 12:00 0.00 389.41 386.42 13.10 06/04 13:00 0.00 389.42 386.39 13.20 06/04 14:00 0.00 389.40 386.41 13.80 06/04 15:00 0.00 389.41 386.41 13.10 06/04 16:00 0.00 389.38 386.40 13.70 06/04 17:00 0.00 389.40 386.41 13.10 06/04 18:00 0.00 389.36 386.36 13.70 06/04 19:00 0.00 389.64 385.99 13.60 06/04 20:00 0.00 389.47 386.10 13.60 06/04 21:00 0.00 389.39 386.07 13.30 06/04 22:00 0.00 389.26 386.03 13.70 06/04 23:00 0.00 389.20 385.98 12.80