Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/06 00:00 0.00 390.09 381.01 13.10 06/06 01:00 0.00 390.14 380.84 13.20 06/06 02:00 0.00 390.18 380.71 13.10 06/06 03:00 0.00 390.22 380.64 13.20 06/06 04:00 0.03 390.24 380.60 13.20 06/06 05:00 0.08 390.26 380.55 13.80 06/06 06:00 0.03 390.28 380.53 13.80 06/06 07:00 0.01 390.28 380.69 13.40 06/06 08:00 0.00 390.31 380.53 13.80 06/06 09:00 0.02 390.30 380.49 13.70 06/06 10:00 0.00 390.31 380.51 13.60 06/06 11:00 0.00 390.33 380.48 13.40 06/06 12:00 0.00 390.34 380.52 13.20 06/06 13:00 0.00 390.35 380.51 13.40 06/06 14:00 0.00 390.35 380.55 13.70 06/06 15:00 0.04 390.41 380.55 13.80 06/06 16:00 0.01 390.44 380.59 13.20 06/06 17:00 0.00 390.45 380.59 13.80 06/06 18:00 0.00 390.50 380.60 13.50 06/06 19:00 0.00 390.51 380.59 13.80 06/06 20:00 0.00 390.50 380.59 13.20 06/06 21:00 0.00 390.51 380.60 13.20 06/06 22:00 0.00 390.53 380.62 13.70 06/06 23:00 0.00 390.52 380.61 13.20