ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/02 00:00 0.00 ---- 878.36 88536 545 1835 13.05 12.97
05/02 01:00 0.00 ---- 878.31 88399 1372 1835 13.05 12.97
05/02 02:00 0.00 ---- 878.28 88317 2166 1834 13.05 12.97
05/02 03:00 1.36 ---- 878.35 88508 3490 1835 13.05 12.97
05/02 04:00 0.47 ---- 878.45 88782 4748 1836 13.05 12.97
05/02 05:00 0.24 ---- 878.61 89219 5875 1838 13.05 12.97
05/02 06:00 0.04 ---- 878.75 89602 6074 1839 13.05 12.97
05/02 07:00 0.01 ---- 878.89 89985 6088 1841 13.05 12.97
05/02 08:00 0.00 ---- 878.99 90259 5504 1842 13.05 12.97
05/02 09:00 0.00 ---- 879.09 90537 4849 1843 13.05 12.97
05/02 10:00 0.00 ---- 879.16 90733 4126 1843 13.05 12.97
05/02 11:00 0.00 ---- 879.20 90845 3465 1844 13.05 12.97
05/02 12:00 0.00 ---- 879.23 90929 2791 1844 13.05 12.97
05/02 13:00 0.00 ---- 879.23 90929 2317 1844 13.05 12.97
05/02 14:00 0.00 ---- 879.23 90929 1979 1844 13.05 12.97
05/02 15:00 0.00 ---- 879.23 90929 1709 1844 13.05 12.97
05/02 16:00 0.00 ---- 879.22 90901 1506 1844 13.05 12.97
05/02 17:00 0.00 ---- 879.21 90873 1438 1844 13.05 12.97
05/02 18:00 0.00 ---- 879.18 90789 1235 1844 13.05 12.97
05/02 19:00 0.00 ---- 879.17 90761 1032 1843 13.05 12.97
05/02 20:00 0.00 ---- 879.14 90677 964 1843 13.05 12.97
05/02 21:00 0.00 ---- 879.10 90565 896 1843 13.05 12.97
05/02 22:00 0.00 ---- 879.08 90509 964 1843 13.05 12.97
05/02 23:00 0.00 ---- 879.05 90426 ---- ---- 13.05 12.97
Data processed at Fri 03May2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.