ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/03 00:00 0.00 ---- 879.03 90370 902 1842 13.05 12.97
05/03 01:00 0.00 ---- 878.99 90259 838 1842 13.05 12.97
05/03 02:00 0.00 ---- 878.96 90177 842 1841 ---- ----
05/03 03:00 0.00 ---- 878.93 90095 646 1841 13.05 12.97
05/03 04:00 0.00 ---- 878.90 90013 782 1841 13.05 12.97
05/03 05:00 0.00 ---- 878.85 89876 781 1840 13.05 12.97
05/03 06:00 0.00 ---- 878.83 89821 715 1840 13.05 12.97
05/03 07:00 0.00 ---- 878.80 89739 648 1840 13.05 12.97
05/03 08:00 0.00 ---- 878.76 89630 846 1839 13.05 12.97
05/03 09:00 0.00 ---- 878.72 89520 780 1839 13.05 12.97
05/03 10:00 0.00 ---- 878.70 89465 780 1839 13.05 12.97
05/03 11:00 0.00 ---- 878.67 89383 845 1838 13.05 12.97
05/03 12:00 0.00 ---- 878.64 89301 911 1838 13.05 12.97
05/03 13:00 0.00 ---- 878.61 89219 911 1838 13.05 12.97
05/03 14:00 0.00 ---- 878.58 89137 845 1837 13.05 12.97
05/03 15:00 0.00 ---- 878.56 89083 911 1837 13.05 12.97
05/03 16:00 0.00 ---- 878.52 88973 778 1837 13.05 12.97
05/03 17:00 0.00 ---- 878.50 88918 844 1837 13.05 12.97
05/03 18:00 0.00 ---- 878.45 88782 645 1836 13.05 12.97
05/03 19:00 0.00 ---- 878.43 88727 711 1836 13.05 12.97
05/03 20:00 0.00 ---- 878.38 88590 578 1835 13.05 12.97
05/03 21:00 0.00 ---- 878.35 88508 710 1835 13.05 12.97
05/03 22:00 0.00 ---- 878.31 88399 511 1835 13.05 12.97
05/03 23:00 0.00 ---- 878.27 88289 ---- ---- 13.05 12.97
Data processed at Sat 04May2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.