ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
05/01 00:00 0.15 ---- 879.27 91040 350 1845 13.05 12.97
05/01 01:00 0.02 ---- 879.21 90873 671 1844 13.05 12.97
05/01 02:00 0.00 ---- 879.15 90705 735 1843 13.05 12.97
05/01 03:00 0.06 ---- 879.15 90705 602 1843 13.05 12.97
05/01 04:00 0.00 ---- 879.11 90593 631 1843 13.05 12.97
05/01 05:00 0.00 ---- 879.08 90509 788 1843 13.05 12.97
05/01 06:00 0.00 ---- 879.03 90370 662 1842 13.05 12.97
05/01 07:00 0.09 ---- 879.00 90286 569 1842 13.05 12.97
05/01 08:00 0.12 ---- 878.98 90231 640 1842 13.05 12.97
05/01 09:00 0.00 ---- 878.92 90067 647 1841 13.05 12.97
05/01 10:00 0.00 ---- 878.90 90013 657 1841 13.05 12.97
05/01 11:00 0.01 ---- 878.85 89876 534 1840 13.05 12.97
05/01 12:00 0.00 ---- 878.82 89794 570 1840 13.05 12.97
05/01 13:00 0.00 ---- 878.78 89684 509 1839 13.05 12.97
05/01 14:00 0.00 ---- 878.73 89548 639 1839 13.05 12.97
05/01 15:00 0.00 ---- 878.70 89465 638 1839 13.05 12.97
05/01 16:00 0.00 ---- 878.67 89383 639 1838 13.05 12.97
05/01 17:00 0.00 ---- 878.64 89301 706 1838 13.05 12.97
05/01 18:00 0.00 ---- 878.60 89192 708 1838 13.05 12.97
05/01 19:00 0.00 ---- 878.56 89083 545 1837 13.05 12.97
05/01 20:00 0.00 ---- 878.53 89001 381 1837 13.05 12.97
05/01 21:00 0.00 ---- 878.49 88891 282 1836 13.05 12.97
05/01 22:00 0.00 ---- 878.42 88700 182 1836 13.05 12.97
05/01 23:00 0.00 ---- 878.40 88645 ---- ---- 13.05 12.97
Data processed at Thu 02May2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.