ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/30 00:00 0.00 ---- 880.04 93194 888 1853 13.05 12.97
04/30 01:00 0.00 ---- 880.02 93137 892 1852 13.05 12.97
04/30 02:00 0.00 ---- 879.99 93052 828 1852 13.05 12.97
04/30 03:00 0.00 ---- 879.96 92968 832 1852 13.05 12.97
04/30 04:00 0.00 ---- 879.92 92857 902 1851 13.05 12.97
04/30 05:00 0.00 ---- 879.89 92773 905 1851 13.05 12.97
04/30 06:00 0.00 ---- 879.88 92745 837 1851 13.05 12.97
04/30 07:00 0.00 ---- 879.85 92661 904 1851 13.05 12.97
04/30 08:00 0.00 ---- 879.81 92549 903 1850 13.05 12.97
04/30 09:00 0.00 ---- 879.78 92465 768 1850 13.05 12.97
04/30 10:00 0.00 ---- 879.75 92381 768 1850 13.05 12.97
04/30 11:00 0.00 ---- 879.72 92298 835 1849 13.05 12.97
04/30 12:00 0.00 ---- 879.69 92214 902 1849 13.05 12.97
04/30 13:00 0.00 ---- 879.66 92130 834 1849 13.05 12.97
04/30 14:00 0.00 ---- 879.64 92074 766 1848 13.05 12.97
04/30 15:00 0.00 ---- 879.60 91962 766 1848 13.05 12.97
04/30 16:00 0.00 ---- 879.56 91851 698 1848 13.05 12.97
04/30 17:00 0.00 ---- 879.53 91767 563 1847 13.05 12.97
04/30 18:00 0.00 ---- 879.49 91655 630 1847 13.05 12.97
04/30 19:00 0.00 ---- 879.45 91543 630 1846 13.05 12.97
04/30 20:00 0.00 ---- 879.42 91460 494 1846 13.05 12.97
04/30 21:00 0.00 ---- 879.38 91348 494 1846 13.05 12.97
04/30 22:00 0.00 ---- 879.33 91208 358 1845 13.05 12.97
04/30 23:00 0.00 ---- 879.28 91068 ---- ---- 13.05 12.97
Data processed at Wed 01May2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.