Upstream stations:
Downstream station: Previous Day
Display graphics.
Display DCP transmissions.
SHEF ID: ARBO2 Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Control Pool: Bottom = 872.00, Top = 885.30
PRECIP PRECIP(2) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
INCHES INCHES FEET ACFT CFS CFS VOLTS VOLTS
GOES GOES GOES GOES COMPRESQ COMPRESQ GOES GOES
(Cen)
02/09 01:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 02:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 03:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 04:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 05:00 0.00 0.00 868.47 64425 0 1 14.10 13.53
02/09 06:00 0.00 0.00 868.47 64425 1 1 14.10 13.24
02/09 07:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 08:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 09:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 10:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 11:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 12:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 13:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 14:00 0.00 0.00 868.48 64446 1 1 14.10 13.42
02/09 15:00 0.00 0.00 868.48 64446 1 1 14.10 13.53
02/09 16:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 17:00 0.00 0.00 868.47 64425 1 1 14.10 13.53
02/09 18:00 0.00 0.00 868.48 64446 ---- ---- 14.10 13.53
02/09 19:00 ---- ---- ---- ---- ---- ---- ---- ----
02/09 20:00 ---- ---- ---- ---- ---- ---- ---- ----
02/09 21:00 ---- ---- ---- ---- ---- ---- ---- ----
02/09 22:00 ---- ---- ---- ---- ---- ---- ---- ----
02/09 23:00 ---- ---- ---- ---- ---- ---- ---- ----
02/10 00:00 ---- ---- ---- ---- ---- ---- ---- ----