ARBO2: Arbuckle Lake

                                SHEF ID:       ARBO2     Arbuckle Lake
STATION TYPE: RESERVOIR
Flood Pool: Bottom = 872.00, Top = 885.30

PRECIP PRECIP(A) ELEVATION STORAGE INFLOW RELEASE VOLTAGE BAT-LOAD
in in ft ac-ft cfs cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev
(America/Chicago)
04/26 00:00 0.00 ---- 871.34 70866 1 1 13.05 12.97
04/26 01:00 0.00 ---- 871.35 70889 1 1 13.05 12.97
04/26 02:00 0.00 ---- 871.34 70866 1 1 13.05 12.97
04/26 03:00 0.00 ---- 871.34 70866 1 1 13.05 12.97
04/26 04:00 0.00 ---- 871.34 70866 266 1 13.05 12.97
04/26 05:00 0.06 ---- 871.34 70866 266 1 13.05 12.97
04/26 06:00 0.41 ---- 871.39 70982 530 1 13.05 12.97
04/26 07:00 0.06 ---- 871.38 70959 583 1 13.05 12.97
04/26 08:00 0.36 ---- 871.43 71075 636 1 13.05 12.97
04/26 09:00 0.03 ---- 871.44 71098 424 1 13.05 12.97
04/26 10:00 0.01 ---- 871.45 71121 530 1 13.05 12.97
04/26 11:00 0.00 ---- 871.46 71145 371 1 13.05 13.05
04/26 12:00 0.00 ---- 871.48 71191 318 1 13.05 12.97
04/26 13:00 0.00 ---- 871.50 71237 265 1 13.05 12.97
04/26 14:00 0.00 ---- 871.50 71237 325 1 13.05 12.97
04/26 15:00 0.00 ---- 871.50 71237 219 1 13.05 12.97
04/26 16:00 0.00 ---- 871.52 71284 113 1 13.05 12.97
04/26 17:00 0.00 ---- 871.52 71284 113 1 13.05 12.97
04/26 18:00 0.00 ---- 871.51 71261 170 1 13.05 12.97
04/26 19:00 0.00 ---- 871.52 71284 57 1 13.05 12.97
04/26 20:00 0.00 ---- 871.53 71307 57 1 13.05 12.97
04/26 21:00 0.00 ---- 871.53 71307 57 1 13.05 12.97
04/26 22:00 0.00 ---- 871.53 71307 57 1 13.05 12.97
04/26 23:00 0.00 ---- 871.54 71330 ---- ---- 13.05 12.97
Data processed at Sat 27Apr2024 04:04 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
ARBU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
ARBU.Precip-Inc Alt.Total.1Hour.1Hour.Ccp-Rev
ARBU.Elev.Inst.1Hour.0.Ccp-Rev
ARBU.Stor.Inst.1Hour.0.Ccp-Rev
ARBU.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
ARBU.Flow-Res Out.Inst.1Hour.0.Rev-Regi-Flowgroup
ARBU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
ARBU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.