WCOM7: Spring River, Waco, MO

                                SHEF ID:       WCOM7     Spring R A - Waco MO
STATION TYPE: Stream Gauge
Regulating: Stage = 19.00, Flow = 17743

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/25 00:00 0.00 4.99 2280 12.83
01/25 01:00 0.00 4.87 2181 12.81
01/25 02:00 0.00 4.80 2124 12.79
01/25 03:00 0.00 4.73 2067 12.78
01/25 04:00 0.00 4.64 1996 12.77
01/25 05:00 0.00 4.57 1939 12.76
01/25 06:00 0.00 4.51 1891 12.73
01/25 07:00 0.00 4.44 1835 12.72
01/25 08:00 0.00 4.34 1757 12.70
01/25 09:00 0.00 4.28 1710 12.70
01/25 10:00 0.00 4.22 1664 12.73
01/25 11:00 0.00 4.20 1649 12.92
01/25 12:00 0.00 4.12 1589 13.30
01/25 13:00 0.00 4.10 1574 13.59
01/25 14:00 0.00 4.00 1497 13.65
01/25 15:00 0.00 3.94 1460 13.68
01/25 16:00 0.00 3.93 1453 13.44
01/25 17:00 0.00 3.89 1429 13.28
01/25 18:00 0.00 3.85 1404 13.05
01/25 19:00 0.00 3.82 1386 12.94
01/25 20:00 0.00 3.80 1374 12.90
01/25 21:00 0.00 3.77 1356 12.86
01/25 22:00 0.00 3.76 1350 12.84
01/25 23:00 0.00 3.78 1362 12.82
Data processed at Fri 26Jan2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
WACO.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
WACO.Stage.Inst.1Hour.0.Ccp-Rev
WACO.Flow.Inst.1Hour.0.Ccp-Rev
WACO.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.