SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/25 00:00 0.00 18.97 39850 12.86
04/25 01:00 0.00 18.95 39750 12.83
04/25 02:00 0.00 18.95 39750 12.82
04/25 03:00 0.00 18.93 39650 12.80
04/25 04:00 0.00 18.97 39850 12.79
04/25 05:00 0.00 18.96 39800 12.77
04/25 06:00 0.00 18.96 39800 12.77
04/25 07:00 0.00 18.97 39850 12.83
04/25 08:00 0.00 18.98 39900 13.20
04/25 09:00 0.00 18.96 39800 13.46
04/25 10:00 0.00 19.01 40050 13.34
04/25 11:00 0.00 18.97 39850 13.05
04/25 12:00 0.00 18.97 39850 13.06
04/25 13:00 0.00 19.07 40350 13.07
04/25 14:00 0.00 19.09 40450 13.07
04/25 15:00 0.00 19.13 40650 13.08
04/25 16:00 0.00 19.13 40650 13.06
04/25 17:00 0.00 19.21 41050 13.07
04/25 18:00 0.00 19.24 41200 13.01
04/25 19:00 0.00 19.28 41400 12.96
04/25 20:00 0.00 19.33 41650 12.93
04/25 21:00 0.00 19.36 41800 12.92
04/25 22:00 0.00 19.33 41650 12.93
04/25 23:00 ---- ---- ---- ----
Data processed at Sat 26Apr2025 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.