SVPL1: Red River at Shreveport Site 2

                                SHEF ID:       SVPL1     Red River at Shreveport Site 2
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/24 00:00 0.00 19.51 42550 12.77
04/24 01:00 0.00 19.51 42550 12.77
04/24 02:00 0.00 19.40 42000 12.76
04/24 03:00 0.00 19.37 41850 12.76
04/24 04:00 0.00 19.35 41750 12.75
04/24 05:00 0.00 19.32 41600 12.75
04/24 06:00 0.00 19.29 41450 12.75
04/24 07:00 0.00 19.17 40850 12.77
04/24 08:00 0.00 19.21 41050 12.85
04/24 09:00 0.00 19.17 40850 12.94
04/24 10:00 0.00 19.10 40500 13.25
04/24 11:00 0.00 19.02 40100 13.32
04/24 12:00 0.00 19.07 40350 13.26
04/24 13:00 0.00 19.03 40150 13.36
04/24 14:00 0.00 19.01 40050 13.80
04/24 15:00 0.00 18.95 39750 13.05
04/24 16:00 0.00 18.89 39450 13.07
04/24 17:00 0.00 18.94 39700 13.03
04/24 18:00 0.00 18.91 39550 12.96
04/24 19:00 0.00 18.88 39400 12.94
04/24 20:00 0.00 18.83 39150 12.93
04/24 21:00 0.00 18.95 39750 12.91
04/24 22:00 0.00 18.83 39150 12.93
04/24 23:00 ---- ---- ---- ----
Data processed at Fri 25Apr2025 04:24 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
SHRE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
SHRE.Stage.Inst.1Hour.0.Ccp-Rev
SHRE.Flow.Inst.1Hour.0.Ccp-Rev
SHRE.Volt-Battery.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.