Downstream station:
SHEF ID: SFRO2 Stillwater Fairgrounds RD
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
12/30 00:00 0.00 5.37 5 12.73 12.57
12/30 01:00 0.00 5.35 5 12.73 12.57
12/30 02:00 0.00 5.33 5 12.65 12.57
12/30 03:00 0.00 5.32 5 12.65 12.57
12/30 04:00 0.00 5.33 5 12.65 12.49
12/30 05:00 0.00 5.38 6 12.65 12.49
12/30 06:00 0.00 5.37 5 12.65 12.49
12/30 07:00 0.00 5.28 4 12.57 12.41
12/30 08:00 0.00 5.42 6 12.65 12.49
12/30 09:00 0.00 5.46 7 12.65 12.41
12/30 10:00 0.00 5.26 4 12.81 12.65
12/30 11:00 0.00 5.21 3 13.37 13.21
12/30 12:00 0.00 5.24 4 13.53 13.53
12/30 13:00 0.00 5.14 2 13.44 13.44
12/30 14:00 0.00 5.16 2 13.53 13.44
12/30 15:00 0.00 5.18 3 14.24 13.44
12/30 16:00 0.00 5.17 3 13.53 13.37
12/30 17:00 0.00 5.20 3 13.13 13.05
12/30 18:00 0.00 5.32 5 12.97 12.89
12/30 19:00 0.00 5.39 6 12.97 12.81
12/30 20:00 0.00 5.44 7 12.89 12.73
12/30 21:00 ---- ---- ---- ---- ----
12/30 22:00 ---- ---- ---- ---- ----
12/30 23:00 ---- ---- ---- ---- ----