Downstream station:
SHEF ID: SFRO2 Stillwater Fairgrounds RD
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
12/29 00:00 0.00 5.45 7 12.81 12.65
12/29 01:00 0.00 5.55 8 12.81 12.65
12/29 02:00 0.00 5.10 1 12.73 12.65
12/29 03:00 0.00 5.46 7 12.73 12.65
12/29 04:00 0.00 5.54 8 12.73 12.57
12/29 05:00 0.00 5.35 5 12.73 12.57
12/29 06:00 0.00 5.38 6 12.73 12.57
12/29 07:00 0.00 5.51 8 12.65 12.57
12/29 08:00 0.00 5.46 7 12.65 12.57
12/29 09:00 0.00 4.89 0 12.65 12.49
12/29 10:00 0.00 5.26 4 12.65 12.57
12/29 11:00 0.00 5.22 3 13.53 13.05
12/29 12:00 0.00 5.43 6 13.53 13.53
12/29 13:00 0.00 5.38 6 13.53 13.68
12/29 14:00 0.00 5.13 2 13.44 13.53
12/29 15:00 0.00 5.27 4 13.92 13.44
12/29 16:00 0.00 5.41 6 13.44 13.37
12/29 17:00 0.00 5.28 4 13.21 13.21
12/29 18:00 0.00 5.06 1 12.97 12.89
12/29 19:00 0.00 5.47 7 12.97 12.81
12/29 20:00 0.00 5.27 4 12.89 12.73
12/29 21:00 ---- ---- ---- ---- ----
12/29 22:00 ---- ---- ---- ---- ----
12/29 23:00 ---- ---- ---- ---- ----