PTAO2: Poteau River, Poteau, OK

                                
SHEF ID:       PTAO2     Poteau River at Poteau, OK
STATION TYPE:  
Regulating: Stage =    20.00, Flow =     7385

               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/11 00:00      0.00      3.02       273     12.84     12.53
08/11 01:00      0.00      3.00       267     12.82     12.50
08/11 02:00      0.00      2.98       261     12.81     12.50
08/11 03:00      0.00      2.96       255     12.80     12.49
08/11 04:00      0.00      2.94       249     12.79     12.48
08/11 05:00      0.00      2.92       243     12.78     12.47
08/11 06:00      0.00      2.90       238     12.77     12.47
08/11 07:00      0.00      2.88       232     12.77     12.46
08/11 08:00      0.00      2.87       229     13.11     12.55
08/11 09:00      0.00      2.85       224     14.17     13.36
08/11 10:00      0.00      2.83       219     13.97     13.15
08/11 11:00      0.00      2.81       213     13.41     13.09
08/11 12:00      0.00      2.79       208     13.39     13.07
08/11 13:00      0.00      2.77       203     13.49     13.07
08/11 14:00      0.00      2.76       200     13.40     13.07
08/11 15:00      0.00      2.74       196     13.58     13.07
08/11 16:00      0.00      2.73       195     13.47     13.05
08/11 17:00      0.00      2.71       191     13.45     13.04
08/11 18:00      0.00      2.71       191     14.18     13.14
08/11 19:00      0.00      2.69       188     13.59     13.02
08/11 20:00      0.00      2.69       188     12.97     12.71
08/11 21:00      0.00      2.69       188     12.90     12.59
08/11 22:00      0.00      2.68       186     12.87     12.56
08/11 23:00      0.00      2.68       186     12.86     12.54

                            
Data processed at Sat 12Aug2023 04:54 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
POTE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
POTE.Stage.Inst.1Hour.0.Ccp-Rev
POTE.Flow.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.