PTAO2: Poteau River, Poteau, OK

                                
SHEF ID:       PTAO2     Poteau River at Poteau, OK
STATION TYPE:  
Regulating: Stage =    20.00, Flow =     7385

               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/10 00:00      0.00      4.06       655     12.86     12.57
08/10 01:00      0.00      3.97       619     12.86     12.54
08/10 02:00      0.00      3.90       592     12.84     12.53
08/10 03:00      0.00      3.82       562     12.83     12.51
08/10 04:00      0.00      3.75       533     12.82     12.50
08/10 05:00      0.00      3.67       500     12.81     12.49
08/10 06:00      0.00      3.61       477     12.80     12.48
08/10 07:00      0.00      3.54       450     12.80     12.47
08/10 08:00      0.00      3.49       431     13.06     12.63
08/10 09:00      0.00      3.44       412     13.68     13.40
08/10 10:00      0.00      3.39       394     14.16     13.22
08/10 11:00      0.00      3.35       380     14.22     13.19
08/10 12:00      0.00      3.31       366     13.51     13.13
08/10 13:00      0.00      3.27       353      ----      ----
08/10 14:00      0.00      3.24       342     13.42     13.06
08/10 15:00      0.00      3.21       333     13.39     13.06
08/10 16:00      0.00      3.18       323     14.08     13.05
08/10 17:00      0.00      3.15       313     13.43     13.05
08/10 18:00      0.00      3.12       304     14.21     13.06
08/10 19:00      0.00      3.10       297     13.72     13.06
08/10 20:00      0.00      3.09       294     12.99     12.73
08/10 21:00      0.00      3.07       288     12.90     12.59
08/10 22:00      0.00      3.06       285     12.88     12.57
08/10 23:00      0.00      3.04       279     12.85     12.54

                            
Data processed at Fri 11Aug2023 04:55 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
POTE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
POTE.Stage.Inst.1Hour.0.Ccp-Rev
POTE.Flow.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery.Inst.1Hour.0.Ccp-Rev
POTE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.