PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/03 00:00 0.00 ---- 14.60 10505 12.46
07/03 01:00 0.00 ---- 14.58 10474 12.44
07/03 02:00 0.00 ---- 14.57 10458 12.43
07/03 03:00 0.00 ---- 14.58 10474 12.40
07/03 04:00 0.00 ---- 14.56 10443 12.40
07/03 05:00 0.00 ---- 14.56 10443 12.37
07/03 06:00 0.00 ---- 14.55 10427 12.36
07/03 07:00 0.00 ---- 14.52 10381 12.33
07/03 08:00 0.00 ---- 14.52 10381 12.35
07/03 09:00 0.00 ---- 14.51 10365 12.61
07/03 10:00 0.00 ---- 14.49 10334 12.96
07/03 11:00 0.00 ---- 14.50 10350 13.07
07/03 12:00 0.00 ---- 14.47 10303 13.39
07/03 13:00 0.00 ---- 14.47 10303 13.41
07/03 14:00 0.00 ---- 14.46 10288 13.20
07/03 15:00 0.00 ---- 14.44 10257 13.03
07/03 16:00 0.00 ---- 14.44 10257 13.06
07/03 17:00 0.00 ---- 14.45 10272 13.01
07/03 18:00 0.00 ---- 14.44 10257 12.99
07/03 19:00 0.00 ---- 14.43 10241 12.60
07/03 20:00 0.00 ---- 14.42 10226 11.64
07/03 21:00 0.00 ---- 14.42 10226 12.52
07/03 22:00 0.00 ---- 14.45 10272 12.50
07/03 23:00 0.00 ---- 14.42 10226 12.48
Data processed at Fri 04Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.