PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/02 00:00 0.00 ---- 15.08 11251 12.46
07/02 01:00 0.00 ---- 15.06 11220 12.45
07/02 02:00 0.00 ---- 15.01 11142 12.41
07/02 03:00 0.00 ---- 14.99 11111 12.41
07/02 04:00 0.00 ---- 14.95 11049 12.40
07/02 05:00 0.00 ---- 14.94 11033 12.37
07/02 06:00 0.00 ---- 14.91 10986 12.36
07/02 07:00 0.00 ---- 14.87 10924 12.36
07/02 08:00 0.00 ---- 14.87 10924 12.37
07/02 09:00 0.00 ---- 14.84 10877 12.63
07/02 10:00 0.00 ---- 14.83 10862 12.96
07/02 11:00 0.00 ---- 14.81 10831 13.13
07/02 12:00 0.00 ---- 14.79 10800 13.45
07/02 13:00 0.00 ---- 14.77 10768 13.35
07/02 14:00 0.00 ---- 14.73 10706 13.13
07/02 15:00 0.00 ---- 14.71 10675 13.09
07/02 16:00 0.00 ---- 14.71 10675 13.08
07/02 17:00 0.00 ---- 14.70 10660 12.94
07/02 18:00 0.00 ---- 14.70 10660 12.97
07/02 19:00 0.00 ---- 14.69 10644 12.61
07/02 20:00 0.00 ---- 14.67 10613 12.54
07/02 21:00 0.00 ---- 14.68 10629 12.53
07/02 22:00 0.00 ---- 14.70 10660 12.50
07/02 23:00 0.00 ---- 14.66 10598 12.47
Data processed at Thu 03Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.