PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/24 00:00 0.00 ---- 14.60 10505 12.45
06/24 01:00 0.00 ---- 14.64 10567 12.44
06/24 02:00 0.00 ---- 14.64 10567 12.44
06/24 03:00 0.00 ---- 14.63 10551 12.42
06/24 04:00 0.00 ---- 14.65 10582 12.40
06/24 05:00 0.00 ---- 14.67 10613 12.38
06/24 06:00 0.00 ---- 14.63 10551 12.35
06/24 07:00 0.00 ---- 14.68 10629 12.37
06/24 08:00 0.00 ---- 14.66 10598 12.38
06/24 09:00 0.00 ---- 14.66 10598 12.50
06/24 10:00 0.00 ---- 14.66 10598 12.90
06/24 11:00 0.00 ---- 14.69 10644 13.03
06/24 12:00 0.00 ---- 14.70 10660 13.26
06/24 13:00 0.00 ---- 14.70 10660 13.45
06/24 14:00 0.00 ---- 14.74 10722 13.23
06/24 15:00 0.00 ---- 14.74 10722 13.06
06/24 16:00 0.00 ---- 14.72 10691 13.06
06/24 17:00 0.00 ---- 14.76 10753 13.03
06/24 18:00 0.00 ---- 14.76 10753 12.99
06/24 19:00 0.00 ---- 14.77 10768 11.86
06/24 20:00 0.00 ---- 14.75 10737 12.54
06/24 21:00 0.00 ---- 14.79 10800 12.52
06/24 22:00 0.00 ---- 14.80 10815 12.51
06/24 23:00 0.00 ---- 14.80 10815 12.48
Data processed at Wed 25Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.