PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/23 00:00 0.00 ---- 14.49 10334 12.48
06/23 01:00 0.00 ---- 14.51 10365 12.47
06/23 02:00 0.00 ---- 14.53 10396 12.44
06/23 03:00 0.00 ---- 14.53 10396 12.42
06/23 04:00 0.00 ---- 14.56 10443 12.40
06/23 05:00 0.00 ---- 14.58 10474 12.37
06/23 06:00 0.00 ---- 14.59 10489 12.36
06/23 07:00 0.00 ---- 14.59 10489 11.43
06/23 08:00 0.00 ---- 14.57 10458 12.40
06/23 09:00 0.00 ---- 14.64 10567 12.61
06/23 10:00 0.00 ---- 14.60 10505 12.95
06/23 11:00 0.00 ---- 14.62 10536 13.07
06/23 12:00 0.00 ---- 14.63 10551 13.34
06/23 13:00 0.00 ---- 14.65 10582 13.41
06/23 14:00 0.00 ---- 14.64 10567 13.14
06/23 15:00 0.00 ---- 14.63 10551 13.07
06/23 16:00 0.00 ---- 14.66 10598 13.07
06/23 17:00 0.00 ---- 14.61 10520 13.01
06/23 18:00 0.00 ---- 14.65 10582 12.98
06/23 19:00 0.00 ---- 14.59 10489 12.59
06/23 20:00 0.00 ---- 14.60 10505 12.54
06/23 21:00 0.00 ---- 14.61 10520 12.52
06/23 22:00 0.00 ---- 14.59 10489 12.51
06/23 23:00 0.00 ---- 14.64 10567 12.47
Data processed at Tue 24Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.