PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/20 00:00 0.00 ---- 13.63 9013 12.50
11/20 01:00 0.00 ---- 13.38 8632 12.48
11/20 02:00 0.00 ---- 13.12 8238 12.47
11/20 03:00 0.00 ---- 12.88 7876 12.45
11/20 04:00 0.00 ---- 12.64 7470 12.44
11/20 05:00 0.00 ---- 12.44 7112 12.44
11/20 06:00 0.00 ---- 12.23 6741 12.44
11/20 07:00 0.00 ---- 12.01 6358 12.40
11/20 08:00 0.00 ---- 11.82 6040 12.53
11/20 09:00 0.00 ---- 11.65 5758 13.48
11/20 10:00 0.00 ---- 11.44 5416 13.86
11/20 11:00 0.00 ---- 11.29 5174 13.78
11/20 12:00 0.00 ---- 11.13 4920 13.72
11/20 13:00 0.00 ---- 10.96 4653 13.78
11/20 14:00 0.00 ---- 10.81 4420 13.78
11/20 15:00 0.00 ---- 10.68 4221 13.80
11/20 16:00 0.00 ---- 10.55 4024 13.78
11/20 17:00 0.00 ---- 10.50 3949 13.54
11/20 18:00 0.00 ---- 10.48 3919 12.65
11/20 19:00 0.00 ---- 10.46 3889 12.61
11/20 20:00 0.00 ---- 10.42 3829 12.57
11/20 21:00 0.00 ---- 10.39 3785 12.54
11/20 22:00 0.00 ---- 10.36 3741 12.50
11/20 23:00 0.00 ---- 10.32 3682 12.50
Data processed at Thu 21Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.