PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/19 00:00 0.00 ---- 14.30 10041 12.23
11/19 01:00 0.00 ---- 14.63 10551 12.21
11/19 02:00 0.00 ---- 14.86 10908 12.20
11/19 03:00 0.00 ---- 15.04 11189 12.19
11/19 04:00 0.00 ---- 15.22 11470 12.18
11/19 05:00 0.00 ---- 15.41 11768 12.14
11/19 06:00 0.00 ---- 15.53 11956 12.14
11/19 07:00 0.00 ---- 15.65 12145 12.15
11/19 08:00 0.00 ---- 15.65 12145 12.27
11/19 09:00 0.00 ---- 15.76 12318 12.96
11/19 10:00 0.00 ---- 15.77 12334 13.03
11/19 11:00 0.00 ---- 15.71 12239 13.13
11/19 12:00 0.00 ---- 15.72 12255 13.23
11/19 13:00 0.00 ---- 15.61 12082 13.32
11/19 14:00 0.00 ---- 15.53 11956 13.41
11/19 15:00 0.00 ---- 15.47 11862 13.48
11/19 16:00 0.00 ---- 15.30 11595 13.40
11/19 17:00 0.00 ---- 15.25 11517 13.01
11/19 18:00 0.00 ---- 15.22 11470 12.69
11/19 19:00 0.00 ---- 15.21 11455 12.62
11/19 20:00 0.00 ---- 15.14 11345 12.59
11/19 21:00 0.00 ---- 15.13 11329 12.57
11/19 22:00 0.00 ---- 15.10 11283 12.54
11/19 23:00 0.00 ---- 15.00 11126 12.52
Data processed at Wed 20Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.