PPFK1: Grand River, Parsons, KS

                                
SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:  
Regulating: Stage =    19.00, Flow =    17526

               PRECIP ELEVATION     STAGE  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/16 00:00      0.00      ----      8.86      1681     12.41
08/16 01:00      0.00      ----      8.79      1596     12.37
08/16 02:00      0.00      ----      8.71      1501     12.36
08/16 03:00      0.00      ----      8.63      1407     12.34
08/16 04:00      0.00      ----      8.56      1325     12.31
08/16 05:00      0.00      ----      8.51      1267     12.30
08/16 06:00      0.00      ----      8.46      1210     12.27
08/16 07:00      0.00      ----      8.40      1143     12.24
08/16 08:00      0.00      ----      8.34      1077     12.27
08/16 09:00      0.00      ----      8.31      1044     13.03
08/16 10:00      0.00      ----      8.27      1001     13.45
08/16 11:00      0.00      ----      8.22       948     13.45
08/16 12:00      0.00      ----      8.19       916     12.95
08/16 13:00      0.00      ----      8.15       874     12.84
08/16 14:00      0.00      ----      8.11       833     12.80
08/16 15:00      0.00      ----      8.09       813     12.73
08/16 16:00      0.00      ----      8.06       782     12.74
08/16 17:00      0.00      ----      8.02       740     12.71
08/16 18:00      0.00      ----      7.99       710     12.67
08/16 19:00      0.00      ----      7.97       690     12.61
08/16 20:00      0.00      ----      7.94       661     12.54
08/16 21:00      0.00      ----      7.92       642     12.50
08/16 22:00      0.00      ----      7.89       615     12.47
08/16 23:00      0.00      ----      7.88       606     12.44

                            
Data processed at Thu 17Aug2023 04:45 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.