PPFK1: Grand River, Parsons, KS

                                
SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:  
Regulating: Stage =    19.00, Flow =    17526

               PRECIP ELEVATION     STAGE  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/15 00:00      0.00      ----     12.44      7112     12.40
08/15 01:00      0.00      ----     12.26      6794     12.37
08/15 02:00      0.00      ----     12.09      6497     12.34
08/15 03:00      0.00      ----     11.91      6189     12.33
08/15 04:00      0.00      ----     11.74      5905     12.31
08/15 05:00      0.00      ----     11.55      5591     12.29
08/15 06:00      0.00      ----     11.38      5314     12.25
08/15 07:00      0.00      ----     11.22      5057     12.24
08/15 08:00      0.00      ----     11.03      4756     12.27
08/15 09:00      0.00      ----     10.88      4520     13.01
08/15 10:00      0.00      ----     10.68      4211     13.50
08/15 11:00      0.00      ----     10.52      3968     13.51
08/15 12:00      0.00      ----     10.34      3700     13.01
08/15 13:00      0.00      ----     10.18      3465     12.86
08/15 14:00      0.00      ----     10.02      3235     12.82
08/15 15:00      0.00      ----      9.87      3023     12.73
08/15 16:00      0.00      ----      9.72      2812     12.76
08/15 17:00      0.00      ----      9.59      2632     12.73
08/15 18:00      0.00      ----      9.46      2454     12.69
08/15 19:00      0.00      ----      9.34      2294     12.62
08/15 20:00      0.00      ----      9.23      2149     12.54
08/15 21:00      0.00      ----      9.13      2020     12.50
08/15 22:00      0.00      ----      9.04      1905     12.47
08/15 23:00      0.00      ----      8.95      1792     12.44

                            
Data processed at Wed 16Aug2023 04:45 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.