PLYK1: Cottonwood River, Plymouth, KS

                                SHEF ID:       PLYK1     COTTONWOOD R NR PLYMOUTH, KS
STATION TYPE:
Regulating: Stage = 28.00, Flow = 11886

PRECIP STAGE STAGE(2) RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/03 00:00 0.00 26.53 ---- 10814 12.70
09/03 01:00 0.00 25.94 ---- 10397 12.67
09/03 02:00 0.00 25.34 ---- 9980 12.65
09/03 03:00 0.00 24.74 ---- 9570 12.63
09/03 04:00 0.00 24.16 ---- 9181 12.61
09/03 05:00 0.00 23.59 ---- 8806 12.60
09/03 06:00 0.00 23.01 ---- 8431 12.57
09/03 07:00 0.00 22.45 ---- 8077 12.54
09/03 08:00 0.00 21.88 ---- 7722 12.52
09/03 09:00 0.00 21.34 ---- 7393 12.60
09/03 10:00 0.00 20.78 ---- 7058 13.38
09/03 11:00 0.00 20.23 ---- 6736 13.24
09/03 12:00 0.00 19.68 ---- 6421 13.22
09/03 13:00 0.00 19.11 ---- 6101 13.19
09/03 14:00 0.00 18.56 ---- 5799 13.16
09/03 15:00 0.00 17.99 ---- 5494 13.05
09/03 16:00 0.00 17.42 ---- 5195 13.02
09/03 17:00 0.00 16.88 ---- 4919 13.04
09/03 18:00 0.00 16.34 ---- 4650 12.88
09/03 19:00 0.00 15.81 ---- 4393 12.82
09/03 20:00 0.00 15.27 ---- 4137 12.77
09/03 21:00 0.00 14.77 ---- 3906 12.75
09/03 22:00 0.00 14.28 ---- 3685 12.72
09/03 23:00 0.00 13.81 ---- 3479 12.70
Data processed at Thu 04Sep2025 04:06 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PLYM.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PLYM.Stage.Inst.1Hour.0.Ccp-Rev
PLYM.Stage-Alt.Inst.1Hour.0.Ccp-Rev
PLYM.Flow.Inst.1Hour.0.Ccp-Rev
PLYM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.