PLYK1: Cottonwood River, Plymouth, KS

                                SHEF ID:       PLYK1     COTTONWOOD R NR PLYMOUTH, KS
STATION TYPE:
Regulating: Stage = 28.00, Flow = 11886

PRECIP STAGE STAGE(2) RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/25 00:00 0.00 11.04 ---- 2372 12.67
05/25 01:00 0.00 10.54 ---- 2192 12.65
05/25 02:00 0.00 10.10 ---- 2039 12.62
05/25 03:00 0.00 9.74 ---- 1917 12.60
05/25 04:00 0.00 9.44 ---- 1818 12.57
05/25 05:00 0.36 9.20 ---- 1741 12.56
05/25 06:00 0.09 8.99 ---- 1674 12.54
05/25 07:00 0.30 8.85 ---- 1631 12.53
05/25 08:00 0.29 8.93 ---- 1655 12.53
05/25 09:00 0.12 10.04 ---- 2018 12.52
05/25 10:00 0.23 12.66 ---- 2997 12.51
05/25 11:00 0.35 15.78 ---- 4378 12.50
05/25 12:00 0.00 19.05 ---- 6068 12.81
05/25 13:00 0.00 21.99 ---- 7790 12.62
05/25 14:00 0.00 24.24 ---- 9234 12.53
05/25 15:00 0.00 25.77 ---- 10278 12.60
05/25 16:00 0.00 26.83 ---- 11030 12.59
05/25 17:00 0.00 27.53 ---- 11539 12.59
05/25 18:00 0.00 27.92 ---- 11827 12.84
05/25 19:00 0.00 28.06 ---- 11931 12.62
05/25 20:00 0.00 28.02 ---- 11901 12.54
05/25 21:00 0.00 27.84 ---- 11767 12.51
05/25 22:00 0.00 27.53 ---- 11539 12.50
05/25 23:00 0.00 27.15 ---- 11261 12.50
Data processed at Mon 26May2025 04:06 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PLYM.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PLYM.Stage.Inst.1Hour.0.Ccp-Rev
PLYM.Stage-Alt.Inst.1Hour.0.Ccp-Rev
PLYM.Flow.Inst.1Hour.0.Ccp-Rev
PLYM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.