Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
04/27 00:00 0.00 5.90 0 12.73 12.65
04/27 01:00 0.00 5.89 0 12.65 12.57
04/27 02:00 0.00 5.89 0 12.65 12.57
04/27 03:00 0.00 5.89 0 12.65 12.57
04/27 04:00 0.00 5.89 0 12.65 12.57
04/27 05:00 0.00 5.89 0 12.65 12.57
04/27 06:00 0.00 5.89 0 12.65 12.57
04/27 07:00 0.00 5.89 0 12.65 12.57
04/27 08:00 0.00 5.89 0 12.65 12.57
04/27 09:00 0.00 5.88 0 12.73 12.57
04/27 10:00 0.00 5.89 0 13.05 12.81
04/27 11:00 0.00 5.89 0 13.37 13.05
04/27 12:00 0.00 5.89 0 13.68 13.05
04/27 13:00 0.00 5.89 0 13.92 13.05
04/27 14:00 0.00 5.90 0 13.60 12.97
04/27 15:00 0.00 5.90 0 14.08 12.81
04/27 16:00 0.00 5.89 0 13.44 12.81
04/27 17:00 0.00 5.89 0 13.68 12.81
04/27 18:00 0.00 5.89 0 14.16 12.81
04/27 19:00 0.00 5.89 0 12.89 12.73
04/27 20:00 0.00 5.89 0 12.73 12.65
04/27 21:00 0.00 5.89 0 12.73 12.65
04/27 22:00 0.00 5.89 0 12.73 12.65
04/27 23:00 ---- ---- ---- ---- ----