Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
04/26 00:00 0.00 5.93 0 12.65 12.65
04/26 01:00 0.00 5.92 0 12.65 12.57
04/26 02:00 0.00 5.92 0 12.65 12.57
04/26 03:00 0.00 5.92 0 12.65 12.57
04/26 04:00 0.00 5.92 0 12.65 12.57
04/26 05:00 0.00 5.92 0 12.57 12.49
04/26 06:00 0.00 5.92 0 12.57 12.49
04/26 07:00 0.00 5.92 0 12.57 12.49
04/26 08:00 0.00 5.91 0 12.57 12.49
04/26 09:00 0.00 5.91 0 12.65 12.57
04/26 10:00 0.00 5.91 0 13.44 13.05
04/26 11:00 0.00 5.91 0 13.92 13.13
04/26 12:00 0.00 5.92 0 13.84 13.05
04/26 13:00 0.00 5.91 0 13.92 13.68
04/26 14:00 0.00 5.92 0 14.08 13.21
04/26 15:00 0.00 5.92 0 13.68 12.81
04/26 16:00 0.00 5.92 0 13.76 12.81
04/26 17:00 0.00 5.92 0 14.08 12.89
04/26 18:00 0.00 5.91 0 13.68 12.81
04/26 19:00 0.00 5.91 0 12.81 12.73
04/26 20:00 0.00 5.91 0 12.73 12.65
04/26 21:00 0.00 5.91 0 12.73 12.65
04/26 22:00 0.00 5.90 0 12.73 12.65
04/26 23:00 ---- ---- ---- ---- ----