CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/20 00:00 0.00 10.51 2508 12.94 12.67
09/20 01:00 0.00 10.49 2489 12.94 12.66
09/20 02:00 0.00 10.47 2469 12.93 12.65
09/20 03:00 0.00 10.45 2450 12.92 12.65
09/20 04:00 0.00 10.43 2427 12.93 12.63
09/20 05:00 0.00 10.41 2405 12.92 12.63
09/20 06:00 0.00 10.40 2394 12.91 12.63
09/20 07:00 0.00 10.38 2372 12.90 12.63
09/20 08:00 0.00 10.37 2361 12.88 12.62
09/20 09:00 0.00 10.35 2339 12.98 12.63
09/20 10:00 0.00 10.34 2328 12.96 12.67
09/20 11:00 0.00 10.31 2296 13.16 12.73
09/20 12:00 0.00 10.30 2285 13.99 12.84
09/20 13:00 0.00 10.28 2263 13.86 12.78
09/20 14:00 0.00 10.27 2253 13.53 12.80
09/20 15:00 0.00 10.26 2242 14.11 12.80
09/20 16:00 0.00 10.26 2242 13.75 12.80
09/20 17:00 0.00 10.26 2242 13.13 12.75
09/20 18:00 0.00 10.25 2232 13.39 12.77
09/20 19:00 0.00 10.24 2221 13.01 12.75
09/20 20:00 0.00 10.23 2211 12.96 12.70
09/20 21:00 0.00 10.22 2200 12.96 12.67
09/20 22:00 0.00 10.22 2200 12.95 12.67
09/20 23:00 0.00 10.21 2190 12.94 12.66
Data processed at Sun 21Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.