CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/19 00:00 0.00 10.31 2296 12.95 12.68
09/19 01:00 0.00 10.32 2306 12.96 12.67
09/19 02:00 0.00 10.33 2317 12.95 12.65
09/19 03:00 0.00 10.35 2339 12.94 12.65
09/19 04:00 0.00 10.37 2361 12.93 12.64
09/19 05:00 0.00 10.39 2383 12.93 12.64
09/19 06:00 0.00 10.41 2405 12.93 12.63
09/19 07:00 0.00 10.44 2439 12.91 12.63
09/19 08:00 0.00 10.46 2460 12.91 12.62
09/19 09:00 0.00 10.48 2479 12.94 12.63
09/19 10:00 0.00 10.51 2508 12.99 12.65
09/19 11:00 0.00 10.54 2538 13.05 12.67
09/19 12:00 0.00 10.55 2548 13.57 12.77
09/19 13:00 0.00 10.57 2568 13.09 12.78
09/19 14:00 0.00 10.58 2578 13.24 12.86
09/19 15:00 0.00 10.60 2598 13.52 12.83
09/19 16:00 0.00 10.60 2598 13.38 12.84
09/19 17:00 0.00 10.60 2598 13.49 12.83
09/19 18:00 0.00 10.59 2588 13.55 12.82
09/19 19:00 0.00 10.59 2588 13.12 12.77
09/19 20:00 0.00 10.57 2568 13.00 12.71
09/19 21:00 0.00 10.56 2558 12.99 12.70
09/19 22:00 0.00 10.54 2538 12.96 12.69
09/19 23:00 0.00 10.53 2528 12.94 12.67
Data processed at Sat 20Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.