CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/25 00:00 0.00 13.84 7064 12.83 12.47
06/25 01:00 0.00 13.78 6971 12.81 12.46
06/25 02:00 0.00 13.70 6850 12.79 12.44
06/25 03:00 0.00 13.62 6729 12.77 12.41
06/25 04:00 0.00 13.52 6581 12.76 12.40
06/25 05:00 0.00 13.43 6438 12.73 12.37
06/25 06:00 0.00 13.32 6257 12.73 12.37
06/25 07:00 0.00 13.22 6096 12.73 12.36
06/25 08:00 0.00 13.12 5937 12.86 12.40
06/25 09:00 0.00 13.02 5782 13.19 12.64
06/25 10:00 0.00 12.93 5645 13.49 12.96
06/25 11:00 0.00 12.85 5525 13.66 13.08
06/25 12:00 0.00 12.78 5421 13.85 12.94
06/25 13:00 0.00 12.71 5319 13.83 12.89
06/25 14:00 0.00 12.66 5245 14.24 12.86
06/25 15:00 0.00 12.61 5167 13.51 12.87
06/25 16:00 0.00 12.57 5105 13.51 12.86
06/25 17:00 0.00 12.53 5044 13.57 12.87
06/25 18:00 0.00 12.50 4998 14.07 12.84
06/25 19:00 0.00 12.48 4968 13.16 12.80
06/25 20:00 0.00 12.46 4938 12.99 12.70
06/25 21:00 0.00 12.44 4908 12.88 12.57
06/25 22:00 0.00 12.42 4878 12.84 12.49
06/25 23:00 0.00 12.39 4833 12.83 12.47
Data processed at Wed 26Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.