CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/24 00:00 0.00 14.09 7457 12.82 12.50
06/24 01:00 0.00 14.08 7441 12.80 12.48
06/24 02:00 0.00 14.09 7457 12.80 12.47
06/24 03:00 0.00 14.08 7441 12.77 12.40
06/24 04:00 0.00 14.08 7441 12.75 12.39
06/24 05:00 0.00 14.07 7425 12.73 12.38
06/24 06:00 0.00 14.07 7425 12.71 12.37
06/24 07:00 0.00 14.07 7425 12.70 12.35
06/24 08:00 0.00 14.06 7409 12.74 12.36
06/24 09:00 0.00 14.06 7409 12.80 12.40
06/24 10:00 0.00 14.05 7393 12.88 12.45
06/24 11:00 0.00 14.04 7377 13.05 12.55
06/24 12:00 0.00 14.03 7361 13.38 12.94
06/24 13:00 0.00 14.02 7345 13.55 13.09
06/24 14:00 0.00 14.02 7345 13.49 12.99
06/24 15:00 0.00 14.01 7330 13.76 12.90
06/24 16:00 0.00 14.00 7314 13.57 12.86
06/24 17:00 0.00 13.99 7298 13.63 12.84
06/24 18:00 0.00 13.99 7298 13.64 12.82
06/24 19:00 0.00 13.98 7282 13.12 12.77
06/24 20:00 0.00 13.97 7266 12.95 12.67
06/24 21:00 0.00 13.96 7251 12.86 12.53
06/24 22:00 0.00 13.93 7204 12.83 12.49
06/24 23:00 0.00 13.88 7126 12.83 12.48
Data processed at Tue 25Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.