CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/16 00:00 0.00 14.46 8035 12.82 12.47
06/16 01:00 0.00 14.45 8020 12.81 12.46
06/16 02:00 0.00 14.44 8005 12.80 12.45
06/16 03:00 0.00 14.43 7990 12.80 12.44
06/16 04:00 0.00 14.43 7990 12.78 12.42
06/16 05:00 0.00 14.42 7975 12.76 12.40
06/16 06:00 0.00 14.41 7960 12.74 12.40
06/16 07:00 0.00 14.40 7946 12.75 12.37
06/16 08:00 0.00 14.39 7931 12.90 12.44
06/16 09:00 0.00 14.38 7916 13.16 12.67
06/16 10:00 0.00 14.37 7901 13.65 12.90
06/16 11:00 0.00 14.37 7901 13.63 13.08
06/16 12:00 0.00 14.36 7886 14.18 12.98
06/16 13:00 0.00 14.36 7886 13.49 12.92
06/16 14:00 0.00 14.35 7871 13.55 12.87
06/16 15:00 0.00 14.34 7857 13.77 12.84
06/16 16:00 0.00 14.33 7842 13.49 12.84
06/16 17:00 0.00 14.32 7827 13.55 12.83
06/16 18:00 0.00 14.33 7842 14.07 12.82
06/16 19:00 0.00 14.32 7827 13.53 12.80
06/16 20:00 0.00 14.31 7812 13.01 12.71
06/16 21:00 0.00 14.30 7798 12.89 12.57
06/16 22:00 0.00 14.29 7782 12.84 12.49
06/16 23:00 0.00 14.29 7782 12.82 12.46
Data processed at Mon 17Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.