CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/15 00:00 0.00 14.63 8292 12.81 12.44
06/15 01:00 0.00 14.63 8292 12.81 12.46
06/15 02:00 0.00 14.62 8277 12.80 12.44
06/15 03:00 0.00 14.61 8262 12.79 12.42
06/15 04:00 0.00 14.60 8247 12.76 12.41
06/15 05:00 0.00 14.60 8247 12.74 12.39
06/15 06:00 0.00 14.58 8216 12.73 12.37
06/15 07:00 0.00 14.58 8216 12.73 12.36
06/15 08:00 0.00 14.58 8216 12.80 12.39
06/15 09:00 0.00 14.57 8201 12.94 12.48
06/15 10:00 0.00 14.55 8171 13.16 12.67
06/15 11:00 0.00 14.54 8156 13.42 12.90
06/15 12:00 0.00 14.53 8140 13.66 13.10
06/15 13:00 0.00 14.53 8140 13.69 12.99
06/15 14:00 0.00 14.52 8125 13.59 12.93
06/15 15:00 0.00 14.52 8125 13.62 12.89
06/15 16:00 0.00 14.51 8110 13.88 12.86
06/15 17:00 0.00 14.51 8110 13.70 12.83
06/15 18:00 0.00 14.49 8080 14.25 12.82
06/15 19:00 0.00 14.50 8095 13.73 12.86
06/15 20:00 0.00 14.49 8080 13.07 12.80
06/15 21:00 0.00 14.48 8065 12.92 12.61
06/15 22:00 0.00 14.47 8050 12.86 12.51
06/15 23:00 0.00 14.47 8050 12.82 12.48
Data processed at Sun 16Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.