CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/02 00:00 0.00 14.65 8323 12.82 12.44
06/02 01:00 0.00 14.59 8231 12.80 12.44
06/02 02:00 0.00 14.51 8110 12.80 12.44
06/02 03:00 0.00 14.44 8005 12.77 12.41
06/02 04:00 0.00 14.37 7901 12.75 12.40
06/02 05:00 0.00 14.31 7812 12.73 12.36
06/02 06:00 0.00 14.23 7684 12.71 12.31
06/02 07:00 0.00 14.16 7570 12.73 12.34
06/02 08:00 0.00 14.09 7457 12.94 12.43
06/02 09:00 0.00 14.02 7345 13.23 12.67
06/02 10:00 0.00 13.97 7266 13.89 13.09
06/02 11:00 0.00 13.90 7157 13.68 13.07
06/02 12:00 0.00 13.85 7079 13.53 12.99
06/02 13:00 0.00 13.80 7002 13.62 12.91
06/02 14:00 0.00 13.76 6941 13.74 12.88
06/02 15:00 0.00 13.71 6865 13.68 12.88
06/02 16:00 0.00 13.67 6804 13.82 12.84
06/02 17:00 0.00 13.63 6744 13.62 12.84
06/02 18:00 0.00 13.59 6684 13.85 12.84
06/02 19:00 0.00 13.56 6640 14.21 12.85
06/02 20:00 0.00 13.53 6596 13.14 12.86
06/02 21:00 0.00 13.51 6566 12.98 12.67
06/02 22:00 0.00 13.48 6521 12.88 12.55
06/02 23:00 0.00 13.45 6471 12.84 12.50
Data processed at Mon 03Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.