CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/01 00:00 0.00 12.96 5690 12.82 12.37
06/01 01:00 0.00 13.03 5797 12.80 12.35
06/01 02:00 0.00 13.06 5844 12.80 12.41
06/01 03:00 0.00 13.09 5891 12.77 12.40
06/01 04:00 0.00 13.12 5937 12.76 12.38
06/01 05:00 0.00 13.16 6000 12.73 12.37
06/01 06:00 0.00 13.22 6096 12.71 12.34
06/01 07:00 0.00 13.32 6257 12.70 12.31
06/01 08:00 0.00 13.44 6455 12.84 12.34
06/01 09:00 0.00 13.60 6699 13.18 12.63
06/01 10:00 0.00 13.78 6971 13.70 12.98
06/01 11:00 0.00 13.99 7298 13.52 13.12
06/01 12:00 0.00 14.15 7554 13.62 13.07
06/01 13:00 0.00 14.31 7812 13.79 13.03
06/01 14:00 0.00 14.47 8050 13.52 12.96
06/01 15:00 0.00 14.57 8201 13.93 12.93
06/01 16:00 0.00 14.67 8354 13.97 12.91
06/01 17:00 0.00 14.73 8446 13.72 12.88
06/01 18:00 0.00 14.77 8508 13.83 12.84
06/01 19:00 0.00 14.80 8555 13.81 12.90
06/01 20:00 0.00 14.79 8539 13.09 12.81
06/01 21:00 0.00 14.78 8524 12.95 12.63
06/01 22:00 0.00 14.76 8492 12.87 12.53
06/01 23:00 0.00 14.71 8415 12.83 12.46
Data processed at Sun 02Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.