CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/18 00:00 0.00 10.19 1681 12.83 12.50
01/18 01:00 0.00 10.18 1675 12.80 12.47
01/18 02:00 0.00 10.18 1675 12.77 12.44
01/18 03:00 0.00 10.17 1668 12.76 12.43
01/18 04:00 0.00 10.16 1661 12.73 12.40
01/18 05:00 0.00 10.15 1654 12.70 12.37
01/18 06:00 0.00 10.14 1648 12.69 12.34
01/18 07:00 0.00 10.14 1648 12.66 12.32
01/18 08:00 0.00 10.13 1641 12.65 12.31
01/18 09:00 0.00 10.13 1641 12.73 12.32
01/18 10:00 0.00 10.12 1634 13.16 12.58
01/18 11:00 0.00 10.11 1628 13.53 12.93
01/18 12:00 0.00 10.10 1621 14.31 13.20
01/18 13:00 0.00 10.09 1615 13.65 13.19
01/18 14:00 0.00 10.10 1621 14.15 13.30
01/18 15:00 0.00 10.11 1628 14.01 13.20
01/18 16:00 0.00 10.14 1648 14.11 13.16
01/18 17:00 0.00 10.15 1654 13.49 13.17
01/18 18:00 0.00 10.14 1648 13.15 12.90
01/18 19:00 0.00 10.14 1648 13.03 12.73
01/18 20:00 0.00 10.14 1648 12.96 12.65
01/18 21:00 0.00 10.14 1648 12.93 12.61
01/18 22:00 0.00 10.14 1648 12.90 12.57
01/18 23:00 0.00 10.14 1648 12.87 12.55
Data processed at Fri 09Feb2024 03:20 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.