CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/17 00:00 0.00 10.16 1661 12.70 12.34
01/17 01:00 0.00 10.16 1661 12.64 12.30
01/17 02:00 0.00 10.15 1652 12.61 12.25
01/17 03:00 0.00 10.13 1641 12.59 12.22
01/17 04:00 0.00 10.10 1621 12.57 12.20
01/17 05:00 0.00 10.07 1602 12.57 12.19
01/17 06:00 0.00 10.05 1588 12.55 12.18
01/17 07:00 0.00 10.04 1582 12.54 12.17
01/17 08:00 0.00 10.03 1575 12.54 12.17
01/17 09:00 0.00 10.02 1568 12.75 12.20
01/17 10:00 0.00 10.02 1568 13.52 12.70
01/17 11:00 0.00 10.03 1575 13.55 13.01
01/17 12:00 0.00 10.02 1568 13.55 13.19
01/17 13:00 0.00 10.02 1568 13.55 13.19
01/17 14:00 0.00 10.03 1575 13.53 13.21
01/17 15:00 0.00 10.07 1602 13.57 13.20
01/17 16:00 0.00 10.10 1621 13.62 13.19
01/17 17:00 0.00 10.11 1628 13.57 13.20
01/17 18:00 0.00 10.15 1654 13.21 12.96
01/17 19:00 0.00 10.18 1675 13.06 12.77
01/17 20:00 0.00 10.19 1681 12.97 12.66
01/17 21:00 0.00 10.20 1688 12.92 12.60
01/17 22:00 0.00 10.19 1681 12.89 12.55
01/17 23:00 0.00 10.19 1681 12.86 12.53
Data processed at Fri 09Feb2024 03:20 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.