Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/25 00:00 0.00 4.30 15 12.24
02/25 01:00 0.00 4.29 14 12.19
02/25 02:00 0.00 4.29 14 12.19
02/25 03:00 0.00 4.29 14 12.19
02/25 04:00 0.00 4.29 14 12.13
02/25 05:00 0.00 4.29 14 12.13
02/25 06:00 0.00 4.29 14 12.13
02/25 07:00 0.00 4.29 14 12.13
02/25 08:00 0.00 4.28 14 12.13
02/25 09:00 0.00 4.28 14 ----
02/25 10:00 0.00 4.28 14 12.77
02/25 11:00 0.00 4.28 14 13.07
02/25 12:00 0.00 4.28 14 13.00
02/25 13:00 0.00 4.28 14 13.07
02/25 14:00 0.00 4.27 13 13.24
02/25 15:00 0.00 4.28 14 13.36
02/25 16:00 0.00 4.27 13 13.36
02/25 17:00 0.00 4.27 13 13.24
02/25 18:00 0.00 4.27 13 12.95
02/25 19:00 0.00 4.27 13 12.42
02/25 20:00 0.00 4.27 13 12.36
02/25 21:00 0.00 4.28 14 12.30
02/25 22:00 ---- ---- ---- ----
02/25 23:00 ---- ---- ---- ----