Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/24 00:00 0.00 4.34 17 12.24
02/24 01:00 0.00 4.34 17 12.24
02/24 02:00 0.00 4.33 16 12.24
02/24 03:00 0.00 4.33 16 12.24
02/24 04:00 0.00 4.33 16 12.24
02/24 05:00 0.00 4.33 16 12.19
02/24 06:00 0.00 4.32 16 12.19
02/24 07:00 0.00 4.33 16 12.19
02/24 08:00 0.00 4.32 16 12.19
02/24 09:00 0.00 4.32 16 12.54
02/24 10:00 0.00 4.32 16 13.48
02/24 11:00 0.00 4.31 15 13.94
02/24 12:00 0.00 4.32 16 13.94
02/24 13:00 0.00 4.31 15 14.00
02/24 14:00 ---- ---- ---- ----
02/24 15:00 ---- 4.31 15 13.83
02/24 16:00 0.00 4.31 15 13.48
02/24 17:00 0.00 4.31 15 13.59
02/24 18:00 0.00 4.31 15 13.07
02/24 19:00 0.00 4.30 15 12.42
02/24 20:00 0.00 4.30 15 12.36
02/24 21:00 0.00 4.30 15 12.36
02/24 22:00 ---- ---- ---- ----
02/24 23:00 ---- ---- ---- ----