Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
01/25 00:00 0.03 4.24 12 12.13
01/25 01:00 0.10 4.24 12 12.13
01/25 02:00 0.14 4.25 12 12.13
01/25 03:00 0.15 4.27 13 12.13
01/25 04:00 0.12 4.28 14 12.13
01/25 05:00 0.06 4.29 14 12.13
01/25 06:00 0.06 4.30 15 12.13
01/25 07:00 0.00 4.30 15 12.13
01/25 08:00 0.00 4.30 15 12.13
01/25 09:00 0.02 4.30 15 12.07
01/25 10:00 0.03 4.30 15 12.13
01/25 11:00 0.07 4.31 15 12.13
01/25 12:00 0.03 4.32 16 12.19
01/25 13:00 0.00 4.32 16 12.42
01/25 14:00 0.00 4.33 16 12.65
01/25 15:00 0.00 4.34 17 12.54
01/25 16:00 0.00 4.35 18 12.48
01/25 17:00 0.00 4.37 19 12.24
01/25 18:00 0.00 4.38 19 12.19
01/25 19:00 0.00 4.38 19 12.13
01/25 20:00 0.00 4.39 20 12.13
01/25 21:00 0.01 4.41 21 12.13
01/25 22:00 0.00 4.42 22 12.13
01/25 23:00 0.00 4.43 23 12.07